Job
Description : Installation of Penstock Pipe on Genyem Hydropower Project
Period : June 2012 - December 2012
Location : Genyem, Papua, Indonesia
Spesification of Penstock Pipe
Total Length : 800 m
Diameter (ID) : 2250 mm
Thickness : 8 up to 24 mm
Layout Penstock Pipe
# Fabrication Process
 |
| Rolled Plate |
 |
| Rolled Plate |
 |
| Longitudinal Weld and Jointing Section |
# Laydown Area
 |
| Workshop |
 |
| Penstock Area |
# Installation Process
 |
| Erection with Excavator |
 |
| Erection & Jointing Pipe |
|
|
 |
| Erection & Jointing Pipe |
 |
| Erection & Jointing Pipe |
 |
| Pipe Installed on Power House |
 |
| Pipe Installed on Power House |
Finishing Process
 |
| Finishing Work Inside Pipe Penstock |
 |
| Finishing Work Outside Pipe Penstock |
 |
| Painting & Installs the Stiffeners |
 |
| Pipe Penstock Painted |
 |
| Pipe Penstock Installed & Painted |