November 27, 2013

2 x 10 MW GENYEM HYDROPOWER PROJECT, PAPUA


Job Description : Installation of Penstock Pipe on Genyem Hydropower Project
Period : June 2012 - December 2012
Location : Genyem, Papua, Indonesia


Spesification of Penstock Pipe
Total Length : 800 m
Diameter (ID) : 2250 mm
Thickness : 8 up to 24 mm

Layout Penstock Pipe


# Fabrication Process
Rolled Plate
Rolled Plate
Longitudinal Weld and Jointing Section

# Laydown Area
Workshop
Penstock Area

# Installation Process
Erection with Excavator
Erection & Jointing Pipe

Erection & Jointing Pipe
Erection & Jointing Pipe
Pipe Installed on Power House
Pipe Installed on Power House

Finishing Process
Finishing Work Inside Pipe Penstock
Finishing Work Outside Pipe Penstock
Painting & Installs the Stiffeners
Pipe Penstock Painted

Pipe Penstock Installed & Painted